Work History
| Project Description | Project Type | Project Location | Type of Contract |
| Engineer, Procure and Construct 1.6 miles of 115kv Transmission Line using single pole, 2-pole H-frame, 3 pole deadend structures. | Transmission | Rochelle, GA | Lump Sum-EPC |
| Engineer, Procure and Construct 34.5 miles of 230kv Transmission Line using 2-pole H-frame structures in a very environmentally and culturally sensitive area. Line designed in consideration of significant BLM and landowner implemented restrictions. | Transmission | Medicine Bow, WY | Lump Sum-EPC |
| Engineer, Procure and Construct 6.5 miles of 230kv Transmission Line using 2-pole H-frame structures. This project included close cooperation with tribal monitors to prevent impacts to culturally sensitive areas. | Transmission | Wessington, SD | Lump Sum-EPC |
| Engineer, Procure, Construct 11 miles, Steel monopole 345kv Transmission Line, including Overhead Fiber Optic full length and requiring work around wetlands. Crossings include distribution lines, natural gas, county roads, and state highways. | Transmission | Corsicana, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 11.6 miles, Steel monopole 345kv Transmission Line, including Overhead Fiber Optic full length. Required work around sensitive cultural sites. Crossings include distribution lines, natural gas, county roads, and state highways. | Transmission | Goldthwaite, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 4.5 miles, wood pole, 138kv Transmission Line. Crossings include distribution lines, gas lines, county roads and a state highway. | Transmission | Zapata, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 9.7 miles, Steel monopole 345kv Transmission Line, including Overhead Fiber Optic full length. Crossings include distribution lines, natural gas, county roads, and a state highway. | Transmission | Mart, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 13.6 miles, Wood H-Frame 345kv Transmission line, including Overhead Fiber Optic full length. Helicopter stringing used to accelerate project. | Transmission | Robert Lee, TX | Lump Sum -EPC |
| Enigneer, Procure, Construct 5.2 miles, Steel 138kv Transmission Line, with drilled pier foundations and direct embed. Line designed to fit road ROW. | Transmission | Redkey, IN | Lump Sum -EPC |
| Enigneer, Procure, Construct 12.6 miles 345kv Transmission line wood H-Frame primary with steel poles and drilled pier foundations, including Overhead Fiber Optic full length. | Transmission | Tarkio, MO | Lump Sum -EPC |
| Engineer, Procure, Construct 7 miles, Steel monopole 345kv Transmission Line, including Overhead Fiber Optic full length. Crossings include distribution lines, natural gas, county roads, and a state highway. | Transmission | Waterville, SD | Lump Sum -EPC |
| Construct 23 miles 115kv Transmission line. | Transmission | Avon, SD | Lump Sum – Construct |
| Engineer, Procure, Construct 7.7 miles, Steel self support double circuit 120kv Transmission line, Including Overhead Fiber Optic full length. Line included helicopter conductor install. Work around sensitive areas, wetlands, active farm land. Crossings included, county roads, private access, distribution and transmission lines. |
Transmission | Huron County, MI | Lump Sum -EPC |
| Engineer, Procure, Construct 5.5 miles, Wood H-Frame 230kv Transmission line, Including Overhead Fiber Optic full length. Line included helicopter conductor install over rough terrain. | Transmission | Glen Rock, WY | Lump Sum -EPC |
| Engineer, Procure, Construct 26 miles, Steel 345kv Transmission line, Including Overhead Fiber Optic full length, crossings include, county roads, transmission lines, distribution lines, state freeway, high volume oil lines. Helicopter stringing used to mitigate crop damage. | Transmission | Bovina, TX | Lump Sum -EPC |
| Construct 9 miles, Steel 138kv Transmission line, Including Overhead Fiber Optic full length, line crosses environmentally sensitive wetland and croplands, crossings include, county roads, transmission lines, distribution lines. | Transmission | Hobart, OK | Lump Sum – construct |
| Engineer, Procure, Construct 5 miles, Steel 345kv Transmission line, Including Overhead Fiber Optic full length, line composit conductors required to pass through conjested point of interconnect, crossings include, county roads, transmission lines, distribution lines, plya lakes, wetlands | Transmission | Silverton, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 5 miles, Wood and Steel 161kv Transmission line, Including Overhead Fiber Optic full length, line crosses environmentally sensitive wetland and croplands, crossings include, county roads, transmission lines, distribution lines. |
Transmission | Sargent, MN | Lump Sum -EPC |
| Engineer, Procure, Construct 21 miles, H-Frame 230kv Transmission line, Including Overhead Fiber Optic full length, line crossed varied environmentally sensitive habitat, and required sequencing to mitigate bird nesting disturbance particularly nesting raptors. Terrain included steep canyons and crop land, crossings included, county roads, distribution lines. |
Transmission | Dayton, WA | Lump Sum -EPC |
| Engineer, Procure, Construct 22 miles, 345kv Overhead steel pole line, with foundations and direct embed, included overhead fiber optic system. Co-ordinated Crossing 345kv transmission, 34.5kv distribution lines, county roads, buried oil and gas lines. Routing through pivot irrigation, and sensitive habitat, pre-construction coordination of habitat mitigation. Helicopter used in stages of wire install. | Transmission | Garden City, KS | Lump Sum -EPC |
| Engineer, Procure, Construct 2.5 miles, 34.5kv Transmission and overhead fiber optic line. Crossings included Freeway, county roads, 115kv overhead, overhead distribution. | Transmission | Lovington, NM | Lump Sum -EPC |
| Engineer, Procure, Construct 42 miles, Steel Pole 230kv Transmission line, including both pier foundations and direct embed, Overhead Fiber Optic full length, line crossed varied environmentally sensitive habitat, and required sequencing to mitigate wildlife disturbance during sensitive seasons. Terrain included steep canyons and crop land, crossings included, county roads, distribution lines. Helicopter used for wire and habitat mitigation. |
Transmission | Limon, CO | Lump Sum -EPC |
| Procure Construct, 8 miles 115kv and 34.5kv underbuild collector system, and overhead fiber optic. combination steel and wood poles, pier foundations and direct embed. Crossing 115kv, distribution, county roads, state highway, environmentally sensitive wetland habitat. Helicopter stringing over rivers, deep canyons, and sensitive areas. Interface and co-ordination with project for crane crossing, project traffic flow. | Transmission | Tunkhannock, PA | Lump Sum -PC |
| Procure Construct, 8 miles 345kv H-Frame Transmission, and 1 mile (3) circ. 34.5kv Overhead collection. Crossing included state highway, distribution lines. Helicopter to install bird diverters and hardline in steep terrain. Co-ordination with landowners through crop and range land. | Transmission | Dodge, WA | Lump Sum -EPC |
| Engineer, Procure, Construct 3.5 miles 138kv Transmission line, Overhead Fiber full length. Terrain heavily wooded. Coordination and interface with project traffic and project haul roads. | Transmission | Armenia Mt. Sylvaia, PA | Lump Sum -EPC |
| Engineer, Procure, Construct 12 miles 230kv Transmission line, Overhead Fiber Optic full length. Sensitive wet land construction mitigated through winter construction in wet lands. Sequencing also around raptor nesting areas. Helicopter used in wire stringing. | Transmission | Arlington, WY | Lump Sum -EPC |
| Engineer, Procure, Construct 11 miles 230kv Transmission line, Overhead Fiber Optic full length. Sensitive wet land construction mitigated through winter construction in wet lands. Sequencing also around raptor nesting areas. Helicopter used in wire stringing. | Transmission | Medicine Bow, WY | Lump Sum -EPC |
| Engineer, Procure, Construct 8 miles 69kv design – energized at 34.5kv Overhead collector, Overhead Fiber Optic full length of line. Line constructed in state and county road right of way. Extensive Traffic control, work near historical building/structures. Crossing/paralleling water, sewer, underground fiber lines. |
Overhead collector | Rubicon, WI | Lump Sum -EPC |
| Engineer, Procure, Construct 3.5 miles 230kv Transmission line, Overhead Fiber Optic full length. Forested mountain terrain. Construction required in winter conditions. Access to project required Co- ordination with project subs all access same road system. | Transmission | Burney, CA | Lump Sum -EPC |
| Engineer, Procure, Construct 3.2 miles 230kv Transmission line, Overhead Fiber Optic full length, Crossings included, county roads, wind farm project roads. Project required scheduling with property owners around crop installations. | Transmission | Dayton, WA | Lump Sum -EPC |
| Engineer, Procure, Construct, 21 miles 138kv single pole Transmission line, Overhead Fiber Optic full length of line. Crossing state highway, county roads, project roads, clearing co-ordination with landowners. Terrain primarily cattle ranch land. | Transmission | Matador, TX | Lump Sum -EPC |
| Engineer, Procure, Construct 4 miles 230kv Transmission line, Overhead Fiber Optic full length, Crossings included, county roads, wind farm project roads 115kv & 230kv transmission, distribution lines. Line crossed actively farmed crop land and cattle range land. | Transmission | Dayton, WA | Lump Sum -EPC |
| Engineer, Procure, Construct 8 miles 230kv Transmission line, Overhead Fiber Optic line, 1 mile 34.5 collector (2) circ (steep ground). Environmentally sensitive areas of wildlife habitat. | Transmission | Ellensburg WA | Lump Sum -EPC |
| Engineer, Procure, Construct 7.5 miles 115kv Transmission line, 1 mile 34.5 overhead collector (3) circ. Overhead Fiber Optic full length of line. Crossing county roads, 230kv line, distribution lines. Sequencing for crop harvest. | Transmission | Turner, WA | Lump Sum -EPC |