Engineer, Procure, Construct 8 miles of Steel 120kv double circuit Transmission line, Including two Overhead Fiber Optic full length, Helicopter used for wire stringing, Worked closely with landowners to ensure crop sensitive land was not damage. |
|
Transmission |
Bad Axe, MI |
Lump Sum – EPC |
Engineer, Procure, Construct 5 miles, Wood H-frame 230kv Transmission line, Including Overhead Fiber Optic full length, Rough terrain with dramatic elevation changes throughout. Helicopter used during wire stringing. |
|
Transmission |
Casper, WY |
Lump Sum – EPC |
Engineer, Procure, Construct 27 miles, Steel 345kv Transmission line, Including Overhead Fiber Optic full length, line crosses state highways, county roads, BNSF Railway, 4 Transmission lines, and more that 20 distribution crossings., Helicopter used for wire stringing. Line follows habitat sensitive Frio Draw. |
|
Transmission |
Hereford, TX |
Lump Sum -EPC |
Construct 9.5 miles, Steel 69kv Transmission line, Including Overhead Fiber Optic full length, line crosses state highways, county roads, and distribution lines. Helicopter used for wire stringing and bird diverter install. |
|
Transmission |
Hobart, OK |
Lump Sum – Construct |
Engineer, Procure, Construct 5 miles, Steel 345kv Transmission line, Including Overhead Fiber Optic full length, line composite conductors required to pass through congested point of interconnect, crossings include, county roads, transmission lines, distribution lines. |
|
Transmission |
Silverton, TX |
Lump Sum -EPC |
Engineer, Procure, Construct 5 miles, Wood and Steel 161kv Transmission line, Including Overhead Fiber Optic full length, line crosses environmentally sensitive wetland and croplands, crossings include, county roads, transmission lines, distribution lines. |
|
Transmission |
Sargeant, MN |
Lump Sum -EPC |
Engineer, Procure, Construct 21 miles, H-Frame 230kv Transmission line, Including Overhead Fiber Optic full length, line crossed varied environmentally sensitive habitat, and required sequencing to mitigate bird nesting disturbance particularly nesting raptors. Terrain includes steep canyons and crop land, crossings included, county roads, distribution lines. |
|
Transmission |
Dayton, WA |
Lump Sum -EPC |
Engineer, Procure, Construct 21 miles, 345kv Overhead steel pole line, with foundations and direct embed, included overhead fiber optic system. Coordinated Crossing 345kv transmission, 34.5kv distribution lines, county roads, buried oil and gas lines. Routing through pivot irrigation, and sensitive habitat, pre-construction coordination of habitat mitigation. Helicopter used in stages of wire install. |
|
Transmission |
Garden City, KS |
Lump Sum -EPC |
Engineer, Procure, Construct 2.5 miles, 34.5kv Transmission and overhead fiber optic line. Crossings included Freeway, county roads, 115kv overhead, overhead distribution. |
|
Transmission |
Lovington, NM |
Lump Sum -EPC |
Engineer, Procure, Construct 42 miles, Steel Pole 230kv Transmission line, including both pier foundations and direct embed, Overhead Fiber Optic full length, line crossed varied environmentally sensitive habitat, and required sequencing to mitigate wildlife disturbance during sensitive seasons. Terrain included steep canyons and cropland, crossings included, county roads, distribution lines. Helicopter used for wire and habitat mitigation. |
|
Transmission |
Limon, CO |
Lump Sum -EPC |
Procure Construct, 8 miles 115kv and 34.5kv underbuild collector system, and overhead fiber optic. Combination steel and wood poles, pier foundations and direct embed. Crossing 115kv, distribution, county roads, state highway, environmentally sensitive wetland habitat. Helicopter stringing over rivers, deep canyons, and sensitive areas. Interface and coordination with project for crane crossing, project traffic flow. |
|
Transmission |
Tunkhannock, PA |
Lump Sum -PC |
Procure Construct, 8 miles 230kv H-Frame Transmission, and 1 mile (3) circ. 34.5kv Overhead collection. Crossing included state highway, distribution lines. Helicopter to install bird diverters and hardline in steep terrain. Coordination with landowners through crop and range land. |
|
Transmission |
Dodge, WA |
Lump Sum -EPC |
Engineer, Procure, Construct 3.5 miles 138kv Transmission line, Overhead Fiber full length. Terrain heavily wooded. Coordination and interface with project traffic and project haul roads. |
|
Transmission |
Armenia Mt. Sylvania, PA |
Lump Sum -EPC |
Engineer, Procure, Construct 12 miles 230kv Transmission line, Overhead Fiber Optic full length. Sensitive wetland construction mitigated through winter construction in wetlands. Sequencing also around raptor nesting areas. Helicopter used in wire stringing. |
|
Transmission |
Arlington, WY |
Lump Sum -EPC |
Engineer, Procure, Construct 11 miles 230kv Transmission line, Overhead Fiber Optic full length. Sensitive wetland construction mitigated through winter construction in wetlands. Sequencing also around raptor nesting areas. Helicopter used in wire stringing. |
|
Transmission |
Medicine Bow, WY |
Lump Sum -EPC |
Engineer, Procure, Construct 8 miles 69kv design – energized at 34.5kv Overhead collector, Overhead Fiber Optic full length of line. Line constructed in state and county road right of way. Extensive Traffic control, work near historical building/structures. Crossing/paralleling water, sewer, underground fiber lines. |
|
Overhead collector |
Rubicon, WI |
Lump Sum -EPC |
Engineer, Procure, Construct 3.5 miles 230kv Transmission line, Overhead Fiber Optic full length. Forested mountain terrain. Construction required in winter conditions. Access to project required coordination with project subs all access same road system. |
|
Transmission |
Burney, CA |
Lump Sum -EPC |
Engineer, Procure, Construct 3.2 miles 230kv Transmission line, Overhead Fiber Optic full length, Crossings included, county roads, wind farm project roads. Project required scheduling with property owners around crop installations. |
|
Transmission |
Dayton, WA |
Lump Sum -EPC |
Engineer, Procure, Construct, 21 miles 138kv single pole Transmission line, Overhead Fiber Optic full length of line. Crossing state highway, county roads, project roads, clearing coordination with landowners. Terrain primarily cattle ranch land. |
|
Transmission |
Matador, TX |
Lump Sum -EPC |
Engineer, Procure, Construct 4 miles 230kv Transmission line, Overhead Fiber Optic full length, Crossings included, county roads, wind farm project roads 115kv & 230kv transmission, distribution lines. Line crossed actively farmed cropland and cattle range land. |
|
Transmission |
Dayton, WA |
Lump Sum -EPC |
Engineer, Procure, Construct 8 miles 230kv Transmission line, Overhead Fiber Optic line, 1 mile 34.5 collector (2) circ (steep ground). Environmentally sensitive areas of wildlife habitat. |
|
Transmission |
Ellensburg WA |
Lump Sum -EPC |
Engineer, Procure, Construct 7.5 miles 115kv Transmission line, 1 mile 34.5 overhead collector (3) circ. Overhead Fiber Optic full length of line. Crossing county roads, 230kv line, distribution lines. Sequencing for crop harvest. |
|
Transmission |
Turner, WA |
Lump Sum -EPC |