- Engineer, procure and construct 1.6 miles of 115kv transmission line using single pole, 2-pole H-frame, 3 pole deadend structures.
- Engineer, procure and construct 34.5 miles of 230kv transmission line using 2-pole H-frame structures in a very environmentally and culturally sensitive area.
- Line designed in consideration of significant BLM and landowner implemented restrictions.
- Engineer, procure and construct 6.5 miles of 230kv transmission line using 2-pole H-frame structures.
- This project included close cooperation with tribal monitors to prevent impacts to culturally sensitive areas.
- Engineer, procure, construct 11 miles, steel monopole 345kv transmission line, including overhead oiber optic full length and requiring work around wetlands.
- Crossings include distribution lines, natural gas, county roads, and state highways.
- Engineer, procure, construct 11.6 miles, steel monopole 345kv transmission line, including overhead fiber optic full length. Required work around sensitive cultural sites.
- Crossings include distribution lines, natural gas, county roads, and state highways.
- Engineer, procure, and construct 14.5 miles of 70kv tranmission line using steel 2-pole H-frame structures, 3-pole guyed structures and single pole structures.
- This project requires close monitoring for environmental impacts, coordination with CA State Parks & BOR, and helicopter work.